Beginning this week CTC will be on site installing the Better Billy Bunker (Google search) liner system. We will be doing all the bunkers on hole 9 and one bunker on hole 2. Why 9 and not elsewhere? The reason is twofold: first there are washout issues on this hole and second the work is very close to the Turf Care Center where all supplies are located. I think the golf course has seen enough damage from project work for awhile.
Bunker Work Timeline: August 9th to the 18th
- Remove existing sand
- Check and repair drainage lines if necessary
- Edge the bunkers
- Install a 2 inch layer of aggregate (small fractured rock similar to gravel put down in parking lots for winter)
- Spray the Billy Bunker polymer that will penetrate and coat the gravel layer
- Install new bunker sand
On The Course:
- Greens vented and topdressed Tuesday/Wednesday
- Dead tree removal in several areas
- Tree line trim (string trimmers and rough mowers in tight to the deeper tree lines)
- Bunker sand depth check and level later this week and into next week