Monday, September 12, 2011

Sod Repairs On The Front 9

  • With the LREP work resulting in most of the 10th fairway being resodded we have decided to use some of the existing turf to repair some failed sod areas on the front 9 fairways. The turf is a perfect match for the sod patches on the 1st, 5th and 7th fairways as well as the haul road that did not do well on the 6th fairway.The small areas on #1 and #5 are repaired and we will be working on #6 tomorrow. I realize this is short notice but it isn't busy and the end result will have a much better finish look in the long term.We will also be regrading and levelling the haul road on #6 before we lay the new turf down. Cart traffic will be re-routed around into the rough for the remainder of the year.

  • LREP is progressing well with the dry weather. Bunkers on holes 15 thru 18 are being worked on at present and the pond liners should be installed within the next 2 weeks.